
Commissioned by EL-SS, ALL-P GROUP completed concrete flooring works across an area of 830 m². The project comprises an electrical equipment retail space and a warehouse facility.
The scope of work included the installation of B30-grade concrete flooring, along with the necessary preparatory and drainage works.
As a result, the client received a durable, purpose-built facility designed to support daily commercial and warehousing operations.