
ALL-P GROUP has completed another outstanding project in the reception area of “Kvareli Lake Resort”.
“360-degree openness creates an environment that blurs the boundary between architecture and nature,” - David Giorgadze, Architect.
The main architectural challenge of the project was to achieve visual and functional continuity between the interior space and the exterior parking area. To reinforce this concept, terrazzo flooring was selected and flawlessly executed by ALL-P GROUP through a precise combination of color and texture.
„To achieve the desired result, we conducted numerous tests. Ultimately, we achieved an outcome that fully met our expectations.” - Architect
As a result, a unified space was created where the flooring naturally connects the indoor and outdoor environments while remaining in complete harmony with the interior design and selected materials.
The total area of completed work amounted to 200 sq.m.
